Left

CivilFEM Online Help

Right

~CPDEF

 

~CPDEF, TYPE, NSTEPS, OPT

Defines the bridge construction process

PREP7: BRIDGES MODULE: Construction process

TYPE

Type of construction process.

0

It is not considered

1

Construction by phases

NSTEPS

Number of steps of the construction process

OPT

Argument not used.

Notes

- This command activates or deactivates the selected construction process and it indicates the number of steps that are necessary for its definition (see ~CPSTDEF command).

- If the construction process is activated, the ~CFLSSLV command should be used for its resolution.

- If the construction process is deactivated (TYPE=0), it will not be taken into account during solution, although the properties of the defined steps are conserved.

- If NSTEPS=0 is introduced, the definition of the construction steps are deleted.

Menu Path

Main Menu > Civil Preprocessor > Bridges Prep > Construction Process > Type

¾¾¾¾¾¾¨¾¾¾¾¾¾