Left

CivilFEM Online Help

Right

~WALLJNT

 

~WALLJNT, STEP, ZANCHOR1, ZANCHOR2, MAT, TYPE, REAL

Defines the anchorages between the first and second wall

PREP7 : GEOTECHNICAL MODULE: Walls

STEP

Excavation step in which it is introduced.

ZANCHOR1

Joint height in the first wall.

ZANCHOR2

Joint height in the second wall.

 MAT

Joint material.

TYPE

Element type.

REAL

Associated real constant (or associated CivilFEM Beam Property).

Menu Paths

Main Menu > CIVIL Preprocessor > Geotech. Mod. > Retaining wall > Joints

¾¾¾¾¾¾¨¾¾¾¾¾¾